Why the data decide the zones
For gases and vapours, IEC 60079-10-1 derives a zone from three things: the grade of release, which says how often and for how long a substance can escape; the release rate; and the ventilation, which sets the degree of dilution and its availability. The release rate in turn depends on the substance, the pressure, the temperature and the size of the opening. Change one input and the zone type or its extent can change with it. For combustible dusts, IEC 60079-10-2 works from the grade of release, the properties of the dust and the housekeeping that keeps layers from building up. Class and Division classification to NFPA 497 and NFPA 499 in the United States draws on much of the same information.
Missing data do not stop a classification, but they push it towards conservative assumptions, and conservative assumptions mean larger zones: more equipment that has to be suitable for the zone, more restrictions on hot work and vehicles, more places to inspect. Good data often cost less than a zone drawn too large.
1. Substances
- Safety data sheets for every flammable liquid, gas and combustible dust on site, including cleaning agents, thinners and products bought in small quantities. Section 9 of a safety data sheet gives most of the physical data the calculation needs: flash point, boiling point, vapour pressure, explosion limits, relative vapour density and auto-ignition temperature. Where a sheet leaves a value blank, we use a literature value and mark it as such. If a product has no safety data sheet, its name and supplier are enough for us to start.
- The composition of mixtures where the sheet gives only ranges, for example the solvent content of a coating or the composition of a gas in a line.
- Quantities stored and handled, per container and in total.
- For combustible dusts: particle size, moisture content and any test results you have, such as the minimum ignition energy, the minimum ignition temperatures of a dust cloud and of a dust layer, the explosion severity (KSt and pmax) and the lower explosion limit. If no tests exist, say so; the report states which values come from the literature and whether a test could change the result.
Some of this can be checked with the free tools on this site: the explosive limits table, which links to a page for each substance, and the LEL calculator for gas mixtures.
2. Process conditions at each source of release
A source of release is any point where a flammable substance can escape: a pump seal, a flange, a valve stem, a sampling point, a vent, a relief valve outlet, a filling nozzle, the open surface of a mixing vessel, a filter housing opened for a change. For each source we need:
- P&IDs where they exist, or a process description with a marked-up sketch for simpler installations;
- the equipment list with seal and connection types, for example single or double mechanical seals, flanged or welded joints;
- operating conditions at the source: pressure, temperature, phase (liquid, gas or both) and flow rate;
- open operations such as filling, decanting, sampling, cleaning and filter changes, with how often each takes place and how long it lasts;
- where vents and relief valves discharge, and whether vapour recovery or extraction is connected;
- maintenance that opens the system, such as draining a line or opening a filter housing;
- for combustible dusts, the points where dust escapes or settles, such as bag tipping, transfer points, silo filling and filter discharge, and the dust extraction and filters connected to them.
3. Layout and building
- A layout or plot plan to scale, with a scale bar or a few key dimensions. A scaled PDF is enough; if you only have CAD files, tell us and we confirm what we can open.
- Heights: ceiling and roof, the height of each opening, and sections where the space has several levels.
- Openings and low points: doors, windows, wall and roof openings, pits, trenches, drains, gullies and cable ducts. Heavy vapours collect low down; hydrogen and natural gas rise.
- Separation: which rooms and areas are open to each other and which are separated by solid walls or closed doors.
- Containment: bunds, kerbs and drip trays, which limit how far a spilled liquid can spread.
- Surroundings: neighbouring buildings, air intakes, possible ignition sources outside the room such as a boiler house or a road, and, for outdoor plant, the walls, pipe racks and equipment that obstruct the air flow around a source.
4. Ventilation
- Natural ventilation: the size, position and height of each permanent opening, and whether it can be closed by doors, shutters or louvres.
- Mechanical ventilation: fan type and flow rate (the design value or, better, a measurement), the positions of supply and extract points, and the air changes per hour.
- Local extraction at sources such as spray booths, filling points or mixing vessels, with its flow rate.
- Reliability: whether the ventilation is interlocked with the process, what happens when a fan stops (an alarm, a shutdown or nothing), and how it is maintained and tested. This decides the availability of the ventilation, which can change the zone type.
For a battery charging area, the battery room ventilation calculator shows which figures matter.
5. Operation and existing documents
- How the plant runs: shifts, batch or continuous operation, start-up and shutdown, and seasonal changes such as summer temperatures.
- Housekeeping, for combustible dusts: how often and by which method dust is cleaned up, and how thick the layers get between cleanings.
- Existing documents: the current zone drawings, the explosion protection document or DSEAR risk assessment, earlier studies, and what has changed since they were written.
- Equipment in and around the areas, electrical and mechanical, with Ex markings and certificates where available. The Ex marking decoder explains each part of a label.
- Inspection and incident records: Ex inspection reports, leaks, near misses and fires.
- Your group standard or project specification, if it sets the method or the drawing conventions, for example the Energy Institute's Model Code of Safe Practice Part 15 or API RP 505.
Photos and short videos: what to capture
For an existing plant, photos and short videos taken by your team replace much of a walk-round. What helps most:
- each source of release, once close up and once from a few metres away, so that its surroundings are visible;
- nameplates and Ex labels, close enough to read;
- every opening, fan and extract point, and the floor and ceiling areas below and above the sources;
- pits, drains and trenches near the sources;
- a tape measure or an object of known size in the picture wherever a distance matters;
- a slow video walking through each room, with a file name or a note that says which room it is.
Please keep people out of the frame. Where something can only be measured on site, such as an air flow, we say what to measure and how.
When data are missing
Every classification starts with gaps. A missing item does not stop the work: it is replaced by an assumption, the assumption is written down, and the calculation sheet shows how the zone would change if the real value were different. Conservative assumptions make zones larger, so the report also lists the data that would allow them to shrink. When those data arrive later, the sheets they affect can be recalculated.
Some things can only be confirmed on site. The report lists them; your team, or a local contractor you appoint, checks them; and the report states what was verified on site and what was not. The verification your country requires before first use stays with a competent person on your side.
Where the classification ends up
In the EU, the zones and the reasoning behind them belong in the explosion protection document required by Article 8 of Directive 1999/92/EC. In Great Britain, DSEAR regulation 7 requires hazardous places to be classified into zones, and HSE's guidance says the area classification drawings should be included in the record of the DSEAR risk assessment. In the United States, OSHA requires areas designated as hazardous (classified) locations to be documented (29 CFR 1910.307(b)), and at sites under process safety management the electrical classification is part of the process safety information (29 CFR 1910.119(d)). In each case, the data pack is what allows someone else to check the zones later.
From data pack to report
- Free first look. Send the drawings and substance data you have. Within one working day we reply with the sources we see, the assumptions to agree and a fixed-price offer.
- Data collection. We send a checklist made for your plant from this list; your team fills the gaps with photos, measurements and documents.
- Calculation and drawings. The source list, a calculation sheet for every source and the zone drawings; the draft is reviewed with you.
- Report. The signed report in English, with a verification page behind the QR code on every page.
Files can be sent by email or through your own file-sharing service, and a non-disclosure agreement can be signed before you send anything. Documents in German or Turkish are fine; the report is written in English. See hazardous area classification for an existing plant, design-stage area classification for a plant still on paper, and the independent review if you already have a classification and want it checked.
Frequently asked questions
We have no P&IDs. Can the classification still be done?
Yes, for many installations. For a store, a spray booth or a filling point, a process description, the equipment list and marked-up photos or sketches can take their place. For a process plant with many lines, P&IDs or at least marked-up flow diagrams are needed, and the offer says so.
Our drawings are out of date. Should we still send them?
Yes. Mark the changes by hand on a print or a photo of the drawing, or list them. The report states which drawing and which revision it is based on, so the next update starts from a known point.
Do we need everything before asking for an offer?
No. The first look works with whatever you have and tells you which items matter for your plant and which can be left out.
Can you work from photos alone?
For a small, simple area, photos with a few measurements can be enough. In most cases photos complete the drawings rather than replace them, and every value read from a photo is marked as such.
Do you visit the site?
Not outside Türkiye. Your team, or a local contractor you appoint, collects what we cannot see, using the checklist, and the report states what was verified on site. In Türkiye we work on site.
Sources
- IEC 60079-10-1:2020 Explosive atmospheres – Part 10-1: Classification of areas – Explosive gas atmospheres
- IEC 60079-10-2:2015 Explosive atmospheres – Part 10-2: Classification of areas – Explosive dust atmospheres
- Directive 1999/92/EC (ATEX 153), Article 8 and Annex I
- Dangerous Substances and Explosive Atmospheres Regulations 2002 (DSEAR), regulation 7 and Schedule 2; HSE, Explosive atmospheres: classification of hazardous areas (zoning) and selection of equipment; HSE, L138 (second edition 2013)
- 29 CFR 1910.307(b) and 29 CFR 1910.119(d); NFPA 497 and NFPA 499
- Regulation (EC) No 1907/2006 (REACH), Annex II (safety data sheet, section 9); the 16-section GHS safety data sheet
- Energy Institute, Model Code of Safe Practice Part 15; API RP 505