Skip to content
Menu

Industries

Explosion protection for fuel stations

Petrol vapour and LPG are heavier than air. When released they do not rise; they settle and collect in low places such as pits, drains and manholes. At a fuel station the dispenser islands, the tank area and the tanker unloading point are therefore assessed together with the structures around them.

Where the explosion risk comes from

While a vehicle is filled, the vapour in its tank is pushed out beside the nozzle. While a tanker unloads, as much vapour leaves the vent pipe as fuel enters the tank. Tank manholes are covered pits below ground, where vapour collects and does not disperse easily. Spilled fuel can also create an explosive atmosphere around it as it evaporates. Diesel is different: its flash point is normally above the ambient temperature, so under normal conditions it does not form an explosive vapour; in very hot climates and where diesel is heated, this margin is checked.

Sources of release

  • Vehicle tank filling point
  • Inside the dispenser housing
  • Underground tanks and manholes
  • Tanker unloading connections
  • Vent pipe outlets
  • Spilled fuel
  • Autogas (LPG) tank, pump and dispenser
  • Nearby drains, gullies and pits

Fuel station design codes and licensing rules are separate obligations. The explosion protection assessment does not replace them, and they do not replace it.

What we look at closely

At a fuel station the extent of the zones is set less by the fuel than by the operation: the nozzle flow rate, the tanker unloading rate, the height of the vent pipe and how open the site is to the wind. A station with vapour recovery and one without do not give the same result at the vent pipe. We therefore do not apply a template; we ask for this information item by item.

How we assess it

  1. Site data and photographs. A site plan or sketch, the number of islands and tanks, nozzle flow rates, hose lengths, and the position and height of the vent pipe are collected with a form.
  2. Sources and release. The grade and rate of release are established for vehicle filling, tanker unloading, the vent pipe, manholes and possible spills. For petrol, summer and winter conditions are assessed separately.
  3. Zone decision. Zones are calculated with the method of IEC 60079-10-1. Where calculation does not fit, such as inside tanks, manholes and the dispenser housing, the decision is written with its reasoning.
  4. Surrounding structures. Shop doors and windows, EV chargers, car washes, generators, drains and channels are compared with the zone boundaries, and a measure is written for every point inside a zone.
  5. Ignition sources and measures. The suitability of electrical equipment in the zones, earthing and static electricity, vehicle traffic and hot work are assessed. A tanker unloading instruction is written into the document.

Gaps worth checking

  • The vent pipe outlet and its surroundings.
  • The tanker unloading point, and coordination during unloading.
  • Drains, channels and pits inside or near a zone.
  • Electrical equipment added later, such as EV chargers, advertising screens, vending machines and lighting.
  • The distance from the shop, car wash and tyre service to the zones.
  • Where autogas is sold, the tank fittings, the pump and the filling nozzle.

What we need from you

  • Site plan or sketch
  • Safety data sheets for the fuels sold
  • Dates of the electrical, earthing and lightning protection inspections
  • Photographs of dispenser and pump labels
  • Tanker unloading arrangements and frequency
  • Where autogas is sold, tank and installation data

What you receive

Calculation sheets and scaled zone drawings for the dispenser islands, the tank area and the tanker unloading point. With them come an equipment suitability assessment, a table of conformity with the minimum requirements of the workplace rules, and an action and control plan. Every page of the report carries a QR code for verifying the document.

Rules in your country

  • Great Britain. Dispensing premises need a petroleum storage certificate from the local Petroleum Enforcement Authority, which also enforces DSEAR there.
  • Germany. Fuel stations need a permit under § 18 BetrSichV, and an approved inspection body (ZÜS) inspects them before commissioning and at intervals.
  • Netherlands. The zones go into the explosieveiligheidsdocument; stations with underground tanks follow PGS 28, and those with above-ground tanks PGS 30.
  • United States. Motor fuel dispensing facilities follow NFPA 30A, and the classified areas around dispensers, vents and fill openings are set out in NEC Article 514; OSHA 29 CFR 1910.106(g) covers service stations. Where a report goes into a permit file, the authority may require a US engineer's stamp, and we then work through your US engineer.
  • Gulf states. The document filed with the authorities is signed by a locally licensed engineering office; we prepare the classification and calculations for that office.
  • Türkiye. The zones go into the explosion protection document required by the 2013 regulation; the station safety standards TS 12820 and, for autogas, TS 11939 are separate obligations. We work on site.

Questions

When should the assessment be prepared or updated?

Before a new station opens; when a new operator takes over, because the document is the employer's; when autogas, an EV charger, a car wash or a new building is added; when tanks, dispensers, vent pipes or the vapour recovery system change; and when the existing document has no calculations or scaled drawings. If you already have a document, we can review it first; a new one is not always needed.

Does vapour recovery change the zones?

It can, especially at the vent pipe during tanker unloading. The calculation shows the difference, which is why the vapour recovery arrangement is one of the items we ask for.

Do you visit stations outside Türkiye?

No. We work from the site form, photographs and drawings your team provides. The on-site verification and the inspections your country requires stay with your competent person or inspection body.

This page is general information. The result for your site is set by calculations based on your site data.

Send us your documents

Within one working day of receiving them we send our first observations and a fixed-price offer. Every question, answer and assumption goes into the project file, so the document can be checked line by line.

Based in
Istanbul, Türkiye
First reply
Usually within one working day